Specifications of Battery Containers

The Energy Storage System adopts a modular design, with a clear hierarchy of battery cells, modules, clusters, and battery systems. It includes a complete battery rack, battery management system (BMS), temperature control system, lighting system, fire detection and automatic fire extinguishing system, security system, emergency system, etc.

Diagram of PCS Step-up System

Inverter boost integrated warehouse include 20 sets of 250kW PCS and 1 set of 5000kVA transformer. The PCS are connected in parallel on the AC side and boosted to 33kV through the transformer. The PCS adopts a circuit breaker to form a disconnection point with the transformer, and the low-voltage side of the transformer is not separately equipped with a low-voltage cabinet. The energy storage unit needs to be connected to the 33kV busbar of the station after converging on the 33kV side.

EMS

Part of Successful Reference for BESS

Accumulated operational projects exceeding 0.5GWh, cumulative order in hand exceeding 1GWh, including industrial and commercial (I&C) energy storage projects exceeding 600MWh.

Utility Scale BESS for Renewable Energy Projects

All-in-One BESS for Industrial and Commercial Scenarios